Industrial Land · For Sale

Wrightstown-Sykesville Road
North Hanover, New Jersey 08562

A 2.40-acre corner industrial site where Burlington, Monmouth and Ocean counties meet — offered with the pre-development work already done. Boundary and topographic survey complete, three sealed concept plans in hand, and by-right zoning confirmed under North Hanover’s 2026 code.

2.40
Acres
104,544
Square Feet
3
Sealed Concepts
30,900
Max Building SF
Preliminary Engineering Complete

Why Wrightstown-Sykesville Road

The entitlement work is already done

This is not a raw land listing. The survey is complete, the concepts are sealed by a licensed New Jersey professional engineer, and the zoning analysis is written. A buyer starts at approvals, not at square one.

TRI-COUNTY CROSSROADS

The parcel sits at the seam of Burlington, Monmouth and Ocean counties — a service radius most Central Jersey contractors cannot reach from a single yard.

THREE ENGINEERED CONCEPTS

Flex trade park, contractor building with outdoor storage, or fleet maintenance garage — all three drawn, sealed and transferable at closing.

BY-RIGHT ZONING

Contractor yards, fleet garages, specialized trades and light assembly are principal permitted uses under §16-160.1 — reviewed against all three 2026 ordinance amendments.

OUTDOOR STORAGE (IOS)

A triangular corner lot with room for a real yard — trailer staging, equipment and material laydown, screened by a 25′ perimeter buffer.

Concept plans · Abbington Engineering, LLC

Three ways to build it

Each concept is a sealed drawing prepared for this parcel, positioned against a specific permitted use. Tap any plan to enlarge and zoom.

Concept Plan 1 — 30,900 SF Multi-Tenant Flex Trade ParkTap to enlarge
Sealed concept drawingAbbington Engineering, LLCBlock 606 · Lot 1

Multi-Tenant Flex Trade Park

The largest and most recent scheme. Four single-story buildings ring a full loop access drive, with a dedicated stormwater basin at the north point of the parcel and two curb cuts on Wrightstown-Sykesville Road. Structured as divisible flex trade space for contractors, light assembly and service users.

Total Building Area30,900 SF
Building Breakdown2 × 5,850 SF + 2 × 9,600 SF
DivisibilityFour Structures, Phaseable
Parking82 Spaces (~2.7 / 1,000 SF)
Building Coverage29.5%
Paved Coverage~39.6% (40% Permitted)
Site FeaturesStormwater Basin • Loop Drive • 2 Curb Cuts
Best Suited ToDeveloper / Multi-Tenant Investor
Zoning basis — §16-160.1.E.7 / .9 / .15 / .16 / .21. Framed around contractor, trade, parcel-delivery and light-assembly uses. Building coverage is drawn above the 25% standard and can be trimmed to conform or carried as a minor coverage variance.

Property Details

Wrightstown-Sykesville Road at a glance

A triangular corner site with long frontage on Wrightstown-Sykesville Road, level and clear, with a wooded edge along the western boundary.

Property TypeIndustrial Land (Vacant)
Lot Size2.40 Acres / 104,544 SF
Block / Lot606 / 1
MunicipalityNorth Hanover Twp., Burlington County
Zoning“I” General Industrial (§16-160)
FrontageCorner Site, Dual Curb Cuts Proposed
EngineeringBoundary & Topographic Survey Complete
Site Concepts3 Sealed Plans — 30,900 / 11,700 / 10,002 SF
Bulk Standards25% Max Building • 40% Max Paved • 35′ Height
UtilitiesOn-Site Septic Field per Concept Plan
Flood ZoneX — Minimal Hazard, 100% of Parcel
2026 Taxes$2,347 (Assessed $94,300)
PriceUpon Request
Overhead: 2.40-Acre Parcel Boundary Outlined
Oblique: Looking North Along the Road Frontage

§16-160 · North Hanover Township Code

Zoning, read closely — including the 2026 amendments

North Hanover amended its code three times in 2026. Each amendment was reviewed with Township Zoning Officer Patti Decker, because two of the three change what a buyer can build in this zone.

Ordinance 2026-13

Warehouse uses removed

Eliminates standalone distribution and logistics fulfillment warehouses as principal permitted uses in the General Industrial zone. Local storage of household or farm goods remains permitted where it does not function as a distribution warehouse. All three concepts here are framed around light assembly, trade services and contractor operations.

Ordinance 2026-09

Data centers prohibited

Prohibits data centers township-wide across all zones, to protect municipal utility infrastructure and environmental resources. Relevant to underwriting: it removes a competing land-use bid, but also closes that exit for a buyer.

Ordinance 2026-11

PURD repeal — no effect here

Repeals Planned Unit Residential Development and cluster housing in the Residential-Agricultural (R-A) zone. Because this parcel lies entirely within the “I” district, the amendment has no impact on its development rights.

Permitted uses — §16-160.1

Motor vehicle repair & fleet storage garagesE.23
Contractor storage buildings & equipment yardsE.7
Electrical contractor facilitiesE.9
Plumbing & heating contractor facilitiesE.16
Sheet metal fabricationE.21
Parcel delivery & courier dispatch stationsE.15
Light manufacturing & assembly (non-noxious)§16-160.1
Research, medical & industrial testing laboratories§16-160.1
Woodworking, cabinetmaking, awnings, printing§16-160.1
All uses permitted in the C and R-A zonesA
Dimensional parameterOrdinance requirementSubject siteStatus
Minimum lot area1.00 AC (43,560 SF)2.40 AC (104,544 SF)Compliant
Minimum lot width150 FT> 150 FTCompliant
Minimum lot depth200 FT> 200 FTCompliant
Front yard setback50 FT50 FT providedCompliant
Side yard setback20 FT each20 FT providedCompliant
Rear yard setback40 FT40 FT providedCompliant
Max building height35 FT< 35 FT proposedCompliant
Max building coverage25.0%Concepts 2 & 3 under 25%; Concept 1 at 29.5%Trim or variance
Max paved coverage40.0%Concept 1 ~39.6%Compliant

Two items to verify in diligence

Lot area. Public tax records list the parcel at 2.40 AC / 104,544 SF, while the zoning table on the engineer’s concept plans lists 2.84 AC / 123,760 SF. Both clear the 1.00 AC minimum by a wide margin; a buyer should confirm the governing number against the boundary survey, which is in the diligence file.

Utilities. The concept plans provide for an on-site septic field and a trash enclosure. Confirm septic design capacity and water service with the Township and the Burlington County Health Department for your intended use and headcount.

Site Photos

Take a look at the parcel

Level, clear and in FEMA Zone X — no mapped flood hazard across any part of the site. Tap any image to enlarge.

Burlington · Monmouth · Ocean

At the crossroads of Central New Jersey

Wrightstown-Sykesville Road feeds directly to I-195, and from there to the Turnpike at Exit 7/7A, I-295 and I-95 — with Joint Base McGuire–Dix–Lakehurst bordering the township.

Regional Context — North Hanover Twp., Burlington County 08562
  • I-195

    East–west spine

    Direct connection between the Turnpike corridor and the Shore, with interchanges minutes from the site.

  • Exit 7/7A

    NJ Turnpike & I-95

    North Jersey, New York and the Port Newark–Elizabeth complex to the north; Philadelphia and Delaware to the south.

  • I-295

    Delaware Valley

    Parallel route into the Burlington–Camden industrial corridor without Turnpike tolls.

  • Port

    Philadelphia & PHL

    Direct highway route to the Port of Philadelphia and Philadelphia International Airport.

  • JB MDL

    Joint Base McGuire–Dix–Lakehurst

    The only tri-service installation in the United States borders North Hanover Township and anchors a standing base of federal contractors, fleet operators and trade vendors.

Available on Request

What the diligence file already contains

Survey, sealed concept plans, zoning memorandum and tax records are ready to send. Engineering CAD files are released to qualified parties.

Boundary & topographic surveyAmerican Layout & Land Surveying · Freehold, NJ
Concept Plan 1 — 30,900 SF flex parkAbbington Engineering, LLC · sealed
Concept Plan 2 — 11,700 SF + IOS yardAbbington Engineering, LLC · sealed
Concept Plan 3 — 10,002 SF garageAbbington Engineering, LLC · sealed
Zoning & due diligence memorandum§16-160 analysis incl. 2026 ordinances
Property detail & tax reportBlock 606 / Lot 1 · APN 26-00606-0000-00001-0000
FEMA flood determinationZone X · minimal hazard · 100% parcel coverage
Engineering CAD filesReleased on request to qualified parties
Request the Diligence Package Open the Brochure (PDF)

Exclusive Brokerage

Request pricing & a site walk

Pricing guidance, the full diligence file and site tours are handled directly by the listing broker.

Eric Koons

Vice President

(908) 410-7152 ekoons@bussel.com bussel.com
Bussel Realty Corp
2 Ethel Road, Suite 202A
Edison, NJ 08817
732.287.3777

Request pricing

Tell us a little about what you’re looking for and Eric will follow up with pricing and the diligence file.

Or call Eric directly at (908) 410-7152.

Also available for sale

  • 780 County Route 537, Cream Ridge, NJ 08514 — coming soon
  • 887 Monmouth Road, New Egypt, NJ 08514
  • 139 Route 526, Allentown, NJ 08501 — warehouse + office
Call Eric